  • The tower mast is 102m tall, although some of the mast is not exposed.

  • The highest floor with the pyramidal atrium is the world's highest church.

  • Phase 2: 28-45, completed February 1992.

  • Phase 3: 46-tower top, completed August 1992.

  • Land cost was triple construction cost.

  • Designed for 8,000 people - 6,000 working.

  • Phase 1: B3-27, completed October 1991.

  • The skydeck on the 44th floor was closed to the public after Septermber 11th, 2001, due to security concerns.

  • There are 39 columns on every typical floor.

  • Site area is 7,230 m².